A Review of Contract Awards to Lowest Bidder in Indian Construction Projects via Case Based Approach

机译:基于案例的方法对印度建设项目最低投标人授予合同的审查

获取原文
           

摘要

Indian construction especially public sector organisations and government department mostly depends on lowest financial bidder for award of contracts. At some point time of these projects, it has become a common scenario that there is a schedule delay resulting in extension of time. So it can be mentioned that modern contract handling procedures require an overhauling. The study presents a case-based approach, in which authors have studied different projects that have been awarded on basis of financial criterion. Ultimately conclusions have been drawn by comparing efficiency of contractor with progress, ratio of bid and project cost and other factors.
机译:印度建筑业,尤其是公共部门组织和政府部门,大多依赖最低的财务竞标者来授予合同。在这些项目的某个时间点,由于时间表的延迟而导致时间的延长已经成为一种常见的情况。因此可以说,现代合同处理程序需要大修。该研究提出了一种基于案例的方法,其中作者研究了根据财务标准获得资助的不同项目。通过将承包商的效率与进度,投标与项目成本的比率以及其他因素进行比较,最终得出结论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号