首页> 外文期刊>Revista de la construccion >Methodology for the preparation of construction project waste management plans based on innovation and productive thinking processes: a case study in Chile
【24h】

Methodology for the preparation of construction project waste management plans based on innovation and productive thinking processes: a case study in Chile

机译:基于创新和生产思维过程的建设项目废物管理计划的编制方法:智利的案例研究

获取原文
           

摘要

The construction industry generates the greatest quantity of solid waste in the world, which is now becoming an environmental and social problem for future generations. Efforts to decrease the impact of construction and demolition waste (C&DW) through mechanisms like clean production agreements, laws, decrees and legislation, among others, are not producing results. Therefore, this article describes a methodology to create a construction and demolition waste management plan (C&DWMP) based on processes of innovation and productive thinking. The plan, implemented in a construction project, aims to include strategies that not only classify and manage C&DW, but also avoid its production and disposal in landfills. The results show a high level of participation, involvement and open-mindedness from the project members. Their ability to come up with ideas and increase awareness to minimize waste was also an achievement. It should be noted that the effectiveness of the C&DW management plan is not presented from a quantitative point of view.
机译:建筑行业产生了世界上最大数量的固体废物,现在这已成为子孙后代的环境和社会问题。通过清洁生产协议,法律,法令和立法等机制来减少建筑废料和拆建废物(C&DW)的影响的努力并未取得成果。因此,本文介绍了一种基于创新和生产思维过程创建拆迁废物管理计划(C&DWMP)的方法。该计划在一个建设项目中实施,旨在包括不仅对C&DW进行分类和管理,而且还避免其在垃圾填埋场生产和处置的策略。结果表明项目成员的高度参与,参与和开放态度。他们提出想法并提高意识以减少浪费的能力也是一项成就。应当指出的是,从定量的角度来看,C&DW管理计划的有效性并未体现出来。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号