首页> 外文期刊>Engineering and Applied Science Research >A solution approach for solving the location routing problem of the central rubber market
【24h】

A solution approach for solving the location routing problem of the central rubber market

机译:解决中央橡胶市场选址问题的解决方案

获取原文
           

摘要

At present, the central rubber market system is still inefficient, especially when it comes to aspects of the difficulty of transportation for certain rubber sellers moving their wares to the central rubber market, because their plantations are far from the central market, and in addition, rubber selling prices are unfair. Therefore, the researchers have designed an algorithm by applying Tabu Search to find the solution to solving location selection problems of rubber purchasing depots replacing the central rubber market and managing vehicle routes from it to the rubber purchasing depot, where the owner must be a member of the Office of Rubber Replanting Aid Fund (ORRAF) or of the Rubber Plantation Fund Cooperative. The capacity of the purchasing location is divided into three types, small size (10 tons), medium size (25 tons) and large size (50 tons), with truck capacities of two sizes, namely, 20 tons maximum and 25.5 tons maximum. The testing results found that the selection of appropriate purchasing depots and the management of appropriate vehicle routes consist of establishing purchasing depots at seven points, along with vehicle capacity of less than 25 tons, leading to a minimum cost of 58,110.58 baht/day.
机译:目前,中央橡胶市场体系仍然效率低下,特别是在某些橡胶销售商将商品转移到中央橡胶市场的运输困难方面,因为他们的种植园远离中央市场,此外,橡胶的销售价格不公平。因此,研究人员设计了一种算法,通过应用禁忌搜索来找到解决方案,以解决替换中央橡胶市场的橡胶采购站的选址问题,并管理从其到橡胶采购站的车辆路线,所有者必须是其中的一员。橡胶种植援助基金办公室(ORRAF)或橡胶种植基金会合作社。采购地点的容量分为小型(10吨),中型(25吨)和大型(50吨)三种类型,卡车容量有两种,即最大20吨和最大25.5吨。测试结果发现,选择合适的采购站和适当的车辆路线管理包括在七个点建立采购站,车辆容量小于25吨,导致最低成本为58,110.58泰铢/天。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号