The Information-Related Time Loss on Construction Sites: A Case Study on Two Sites:

机译:施工现场信息相关的时间损失:以两个现场为例:

获取原文
   

获取外文期刊封面封底 >>

       

摘要

Information management is essential in construction projects. Existing research has identified and discussed problems in communication and information transfer among different stakeholders, such as the loss of information caused by fragmentation and information islands. However, there are few statistics about the direct time waste caused by information loss arising from poor communication and information management. Existing surveys relying on self-reporting questionnaires and interviews often contain various biases. This paper presents a direct observation of two construction sites in China in relation to wasted time and the information flows in these time-wasting events. Analysis of the observation data provides objective and comprehensive statistics on time wasted due to inconsistent information, dislocation and ambiguity. This research also analyses the correlation between participants, information carriers, information loss and the amount of time wasted. Finally, the wasting of time is analysed from the perspective of information flows and problems that cannot be addressed by information technologies are discussed.
机译:信息管理对建设项目至关重要。现有研究已经确定并讨论了不同利益相关者之间的交流和信息传递中的问题,例如由碎片和信息孤岛引起的信息丢失。但是,由于通信和信息管理不善而造成的信息丢失所造成的直接时间浪费的统计数据很少。依靠自我报告调查表和访谈的现有调查通常存在各种偏见。本文直接观察了中国两个建筑工地与时间浪费和这些时间浪费事件中的信息流之间的关系。对观测数据的分析可提供客观,全面的统计信息,以了解由于信息不一致,错位和模棱两可而造成的时间浪费。这项研究还分析了参与者,信息载体,信息丢失和浪费时间之间的相关性。最后,从信息流的角度分析了时间的浪费,并讨论了信息技术无法解决的问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号