首页> 外文期刊>International Journal of Advanced Robotic Systems >The Information-related Time Loss on Construction Sites: A Case Study on Two Sites
【24h】

The Information-related Time Loss on Construction Sites: A Case Study on Two Sites

机译:与施工地点的信息相关的时间损失:两个网站的案例研究

获取原文
获取原文并翻译 | 示例
           

摘要

Information management is essential in construction projects. Existing research has identified and discussed problems in communication and information transfer among different stakeholders, such as the loss of information caused by fragmentation and information islands. However, there are few statistics about the direct time waste caused by information loss arising from poor communication and information management. Existing surveys relying on self-reporting questionnaires and interviews often contain various biases. This paper presents a direct observation of two construction sites in China in relation to wasted time and the information flows in these time-wasting events. Analysis of the observation data provides objective and comprehensive statistics on time wasted due to inconsistent information, dislocation and ambiguity. This research also analyses the correlation between participants, information carriers, information loss and the amount of time wasted. Finally, the wasting of time is analysed from the perspective of information flows and problems that cannot be addressed by information technologies are discussed.
机译:信息管理在施工项目中至关重要。现有的研究已经确定并讨论了不同利益相关者之间的通信和信息转移中的问题,例如由碎片和信息岛引起的信息丢失。但是,涉及通信和信息管理不良引起的信息损失引起的直接时间浪费几乎没有统计数据。依赖于自我报告问卷和访谈的现有调查通常包含各种偏见。本文介绍了中国两个建筑工地的直接观察,浪费时间和这些浪费时间的信息流动。观察数据的分析提供了因信息,错位和歧义而浪费的时间和全面的统计数据。该研究还分析了参与者,信息载体,信息损失与浪费时间的相关性。最后,从信息流的角度分析了浪费时间,并且讨论了信息技术无法解决的问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号