The Significance Risk for Factors of Labour, Material, and Equipment on Construction Project Quality

机译:劳力,材料和设备因素对建设项目质量的重大风险

获取原文
           

摘要

The construction involves a series of activities that possibly face problems or risks. The risk probability is an uncertain condition that results in a negative impact on the project objectives. Threats can come from the resources factor in a construction project, such as labour, materials, and equipment. The handling of risks in construction work needs to be further reviewed. It is to find risk factors and risk variables contributing to high risk to achieve the quality objectives of construction implementation. The purpose of this study was to analyze the most significant risk towards the quality of construction associated with the condition of the Province of Aceh during 2000-2015. The situation is classified in three periods, namely political conflict (2000-2004 as Period I), rehabilitation and reconstruction (2005-2009 as Period II), and post-rehabilitation and reconstruction (2010-2015 as Period III). Dataset is collected using questionnaires to 15 large qualified contractor companies to capture construction quality information. The risk significance identified based on Risk Importance Index (RII) for frequency and severity of factors and variables. There are 7 variables for labour resources, 10 variables for material resources, and 17 variables for equipment resources. The quality of construction mostly affected by the labour resources factors in Period I and Period III. The risk comes from the variable discipline of workers who are not good (A3). For Period II, the lack of labour capacity (A2) variable become as the most significant risk.
机译:施工涉及一系列可能面临问题或风险的活动。风险概率是不确定的条件,会对项目目标产生负面影响。威胁可能来自建设项目中的资源因素,例如劳动力,材料和设备。建设工作中风险的处理需要进一步审查。找出导致高风险的风险因素和风险变量,以实现施工实施的质量目标。这项研究的目的是分析与2000-2015年亚齐省状况有关的建筑质量最重大风险。局势分为三个时期,即政治冲突(2000年至2004年为第一阶段),恢复与重建(2005年至2009年为第二阶段)以及恢复后的重建与重建(2010年至2015年为第三阶段)。使用问卷调查的方式向15个合格的大型承包商公司收集数据集,以获取建筑质量信息。根据风险重要性指数(RII)确定的风险显着性,用于因素和变量的频率和严重性。劳动力资源有7个变量,物质资源有10个变量,设备资源有17个变量。在第一阶段和第三阶段,建筑质量主要受劳动力资源因素的影响。风险来自劣质工人纪律不一(A3)。在第二阶段,劳动力不足(A2)变量成为最大风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号