首页> 外文期刊>Case Studies in Engineering Failure Analysis >Failure investigation of a secondary super heater tube in a 140MW thermal power plant
【24h】

Failure investigation of a secondary super heater tube in a 140MW thermal power plant

机译:140 MW火力发电厂中的二次过热器管的故障调查

获取原文
           

摘要

This article describes the findings of a detailed investigation into the failure of a secondary super heater tube in a 140MW thermal power plant. Preliminary macroscopic examinations along with visual examination, dimensional measurement and chemical analysis were carried out to deduce the probable cause of failure. In addition optical microscopy was a necessary supplement to understand the cause of failure. It was concluded that the tube had failed due to severe creep damage caused by high metal temperature during service. The probable causes of high metal temperature may be in sufficient flow of steam due to partial blockage, presence of thick oxide scale on ID surface, high flue gas temperature etc. rupture.
机译:本文介绍了对140MW火力发电厂中的二次过热器管进行详细调查的结果。进行了初步的宏观检查以及目测,尺寸测量和化学分析,以推断出可能的故障原因。此外,光学显微镜是了解故障原因的必要补充。结论是,由于在维修过程中金属温度高造成的严重蠕变损坏,该管已失效。金属高温度的可能原因可能是由于部分堵塞,内径表面上存在厚的氧化皮,烟道气温度高等原因而导致蒸汽充分流动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号