...
首页> 外文期刊>Bulletin of University of Agricultural Sciences and Veterinary Medicine Cluj-Napoca: Horticulture >Research and Conclusions of Legal and Economic Feasibility of Renewable Energy in Romania
【24h】

Research and Conclusions of Legal and Economic Feasibility of Renewable Energy in Romania

机译:罗马尼亚可再生能源法律和经济可行性的研究与结论

获取原文

摘要

Base materials used in our research are legal documents of the Romanian and Europeanlegislation specific renewable energy field, which define the legal, economic and financial frameworkand have been applied on four specific case studies (investment projects): production of wind, solar orbiomass energy and geothermal energy efficiency using. Research method used was analysis oflegislative, economic, financial, risk sensitivity and feasibility of solutions investigated. Fullliberalization of energy prices will cause significant increases in energy prices on the market and theonly alternative, in our opinion, is increases of energy efficiency by using renewable energy and / ormechanisms for cogeneration. From our research, the full approval period of a proposed investment inelectricity production in Romania is between 12 and 24 months, plus about two years for investmentimplementation, and costs attached thereto are complete about 200,000 eur / project. We also foundthat the total amounts of implementation costs 1,7 to 1,9 million eur per every 1 MWh installed,depending on the type of renewable resource implemented. The electricity can be traded on theregulated or competitive market, wholesale or retail, using one of the trading platforms operated by SCOPCOM SA. The proceeds from the sale of the electricity, one can add additional revenue from thesale of green or greenhouse gases certificates. The substantive conclusion emerges from studies is that,although Romania has significant renewable resources, is necessary to improve the legal and economicframework that could provides financial security, predictability and stability.
机译:我们研究中使用的基础材料是罗马尼亚和欧洲立法特定的可再生能源领域的法律文件,它们定义了法律,经济和金融框架,并已应用于四个特定的案例研究(投资项目):风能,太阳能或生物质能的生产和地热节能使用。使用的研究方法是对立法,经济,财务,风险敏感性和所研究解决方案的可行性进行分析。能源价格的全面开放将导致市场上能源价格的大幅上涨,我们认为,唯一的选择是通过使用可再生能源和/或热电联产机制来提高能源效率。根据我们的研究,拟议中的罗马尼亚电力生产投资的完整批准期为12至24个月,外加约两年的投资实施时间,其相关费用约为200,000欧元/项目。我们还发现,安装的总成本为每安装1兆瓦时1.7至190万欧元,这取决于实施的可再生资源的类型。可以使用SCOPCOM SA运营的交易平台之一在规范或竞争性市场上(批发或零售)进行电力交易。电力销售的收益可以增加绿色或温室气体证书的销售收入。从研究中得出的实质性结论是,尽管罗马尼亚拥有大量可再生资源,但对于改善可提供金融安全,可预测性和稳定性的法律和经济框架是必要的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号