The project goals of the Owner represented a challenge in timing, expediency, energy efficiency and economical first cost for the design team. The University required a new building to house 7 plant pathology research laboratories and 2 teaching laboratories along with associated faculty office space from the College of Agriculture. The new building also needed to provide a 250 seat lecture hall. The building had to be designed and constructed within 18 short months. The design team was given 6 months to complete the design, the University required 3 months to bid and award contracts, and the successful bidder was given 9 months to complete the construction.rnThe ideal site location was adjacent to the existing Agriculture Sciences Building. The faculty formerly resided in a building slated for renovation at a separate academic campus about one mile away. The site itself was bound by the existing Agriculture Sciences Building to the North and a large buried electrical duct bank to the South. The new structure would become an addition to the existing Agricultural Sciences Building, uniting faculty and staff that had been separated for over 40 years by the two academic campuses.
机译:业主的项目目标代表了设计团队在时间,便捷性,能源效率和经济第一成本方​​面的挑战。该大学需要一座新建筑,以容纳7个植物病理研究实验室和2个教学实验室,以及农业学院的相关教职办公室空间。新大楼还需要提供250个座位的演讲厅。该建筑必须在短短的18个月内进行设计和建造。设计团队需要6个月的时间才能完成设计,大学需要3个月的时间来投标和授予合同,而中标者则需要9个月的时间来完成施工。理想的选址是与现有的农业科学大楼相邻。该学院以前居住在一栋计划进行翻新的建筑中,位于约一英里之外的一个单独的学术园区中。该地点本身被北部的现有农业科学大楼和南部的大型埋没式电气管道限制。新的结构将成为现有农业科学大楼的补充,它将由两个学术园区分隔40多年的教职员工组成。

著录项

  • 来源
    《Design Cost Data》 |2007年第5期|48|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑艺术;
  • 关键词

  • 入库时间 2022-08-18 00:28:09

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号