In the minds of the owners, Mark and Wendy Reinhart, the expansion and renovation of the Goddard School in Anderson Township, Ohio, was several years in the making. Initial design costs exceeded their established budget, making a new location and a new building unfeasible, as did the need to provide continuous operation of the daycare school during construction. After some careful thought back at the drawing board, the owners solicited bids from a select few contractors, ultimately settling on DER Development Company. It was eventually determined that creating a hybrid project delivery system would work best. Using Tony Ravagnani Architects (TRA) for the architectural, structural, and civil designs, combined with DER's MEP design-build platform, made the most sense and worked within their budget. The existing 6,208-square-foot building would receive a significant renovation and a 6,236-square-foot addition. It became clear to DER that the school's belief in continually pushing for excellence was vital to their mission. This meant that a design that provided more and better options to the students and parents was paramount to success.
展开▼
机译:在业主马克和温迪·赖因哈特(Mark and Wendy Reinhart)的心目中,位于俄亥俄州安德森镇(Anderson Township)的戈达德学校(Goddard School)的扩建和改建工作已经进行了数年。最初的设计成本超出了他们的既定预算,使得新地点和新建筑不可行,并且在建造过程中需要对托儿所进行持续运营。经过一番周密的考虑后,业主向少数几个承包商征集了投标书,最终选择了DER Development Company。最终确定创建混合项目交付系统将是最好的选择。使用Tony Ravagnani Architects(TRA)进行建筑,结构和土木工程设计,再结合DER的MEP设计构建平台,在预算范围内发挥了最大的作用。现有的6,208平方英尺的建筑物将进行重大翻新,并增加6,236平方英尺。 DER清楚地知道,学校不断追求卓越的信念对于他们的使命至关重要。这意味着为学生和父母提供更多更好的选择的设计对于成功至关重要。
展开▼