首页> 外文期刊>Defense Daily >House Authorization Bill Switches Oiler With LPD-31, Prevents Carrier Retirement
【24h】

House Authorization Bill Switches Oiler With LPD-31, Prevents Carrier Retirement

机译:房屋授权票据将油壶与LPD-31切换,防止运营商退休

获取原文
获取原文并翻译 | 示例
           

摘要

A draft House defense authorization bill would approve the Navy procuring 11 new ships as the administration asked, but replacing a fleet oiler with an amphibious transport dock (LPD). The FY 2020 Navy request sought 12 ships, but that included the two carrier buy Congress authorized in FY ’19. The draft House bill maintains the request for three Virginia-class attack submarines; three Arleigh Burke-class destroyers; the first future frigate (FFG(X)); and two TATS towing salvage, and rescue ships (Defense Daily, March 12). However, the draft approves of only one of two John Lewis-class T-AO-205 fleet replenishment oilers requested and adds the second San Antonio-class Flight II landing Platform Dock, LPD- 31. The draft bill is set to go through a markup in the House Armed Services Committee (HASC) Seapower subcommittee on Tuesday. In the budget request, the Navy delayed LPD-31 from FY ‘20 to’21 to request a third Virginia submarine. Senior committee staff told reporters on Monday that HASC is giving the Navy incremental funding authority for LPD-31 and authorizing it for FY ’20. The committee then rephased one of the oilers for FY ’21. Last year, “when the Navy tried to accelerate one of those, they had not included any long-lead time material funding in the FY ’19 bill. So that ship actually will execute as an FY ’21 ship anyway, so we just rephased that to FY ’21, but still are going to recommend the long-lead time advanced procurement for the second one,” senior committee staff said.
机译:屋外授权法案草案将批准该行政当局提出11个新船舶的海军,而是用两栖运输码头(LPD)取代舰队油厂。 FY 2020海军请求寻求12艘船,但其中包括两家承运人购买大会在FY '19授权。议案法案草案须遵守三个弗吉尼亚级攻击潜艇的要求;三个arleigh burke级驱逐舰;第一个将来的护卫舰(FFG(x));和牵引救援和救援船(3月12日)的两次TAT。但是,批准两种John Lewis-Class T-AO-205舰队补充石油公司的批准草案要求并添加第二个San Antonio级航班II登陆平台码头,LPD-31.法案草案设定为经历星期二在众议院武装委员会(HASC)Seapower小组委员会标记。在预算请求中,海军延迟了来自FY'20到'21的LPD-31,以请求第三弗吉尼亚潜艇。高级委员会工作人员周一告诉记者,HASC为LPD-31提供了海军增量资金机构,并为财政部授权它。然后,委员会重新重现了FY'21的替化者。去年,“当海军试图加速其中一个时,他们没有包括FY'19法案中的任何长期时间重大资金。因此,船舶实际上将作为一个FY'21船舶执行,所以我们刚刚将其重新分解为FY '21,但仍将推荐第二次高级采购第二款,“高级委员会人员说。

著录项

  • 来源
    《Defense Daily》 |2019年第4期|3-5|共3页
  • 作者

    Rich Abott;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号