Damflask reservoir: scour system reservoir safety improvements

机译:达摩拉斯储层:洗涤系统储层安全改进

获取原文
获取原文并翻译 | 示例
           

摘要

Designed by Thomas Hawksley, and completed in 1896, Damflask reservoir was constructed to provide compensation flows to the growing industries downstream in Sheffield. The earth embankment dam incorporates two modified bottom outlets used to release water from the reservoir, each comprising sections of tunnel and pipework together with a series of guard and control valves, to form the reservoir scour system. In 2015, a statutory inspection recommended that improvements were made to comply with modern safety standards and enable the reservoir to be drawn down in a reasonable time, if required in an emergency. This paper provides a brief background to the works at Damflask reservoir and summarises the key technical challenges, which were overcome to improve the existing drawdown facilities; from design development through to construction, commissioning and ongoing operation of the final scheme. It provides an insight into the complex two-year project from the author's perspective as project leader and designer, within the design and build team, commissioned to investigate and undertake the upgrade works.
机译:由Thomas Hawksley设计,并于1896年完成,达姆拉斯泉储层建造,为谢菲尔德下游的日益增长的行业提供补偿流程。地球堤坝坝包括两个改进的底部插座,用于释放来自水库的水,每个插座包括隧道和管道的部分,以及一系列防护装置,形成储层缝制系统。 2015年,法定检验建议进行改进,以遵守现代安全标准,并使水库在紧急情况下需要在合理的时间内被吸引下来。本文为达姆拉斯储层的作品提供了一个简短的背景,并总结了关键的技术挑战,这些挑战是克服的,以改善现有的绘图设施;从设计开发通过施工,调试和持续运作的最终计划。它在设计和建设团队中,在提交人的角度和设计师中,从作者的角度来看,为复杂的两年项目提供了深入了解,委托调查和承担升级作品。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号