首页> 外文期刊>Cost engineering >A Fast Track Value Analysis Methodology for Major Design-Build Construction Projects
【24h】

A Fast Track Value Analysis Methodology for Major Design-Build Construction Projects

机译:重大设计建造项目的快速价值分析方法

获取原文
获取原文并翻译 | 示例
       

摘要

Use of the value analysis (VA) methodology as an integral part of the design/build process, will eliminate unnecessary functions (The basis of VA methodology), will reduce initial and life cycle costs, compress construction schedules (saving time and money) while retaining the core principals of preserving value and function. The fast track VA session described in this case study will illustrate that the concepts and methods used for the Orange County Convention Center, Phase V Expansion, further reinforces the need for continued use and even increased use of the VA methodology in the design-build concept.
机译:将价值分析(VA)方法用作设计/构建过程的组成部分,将消除不必要的功能(VA方法的基础),将减少初始和生命周期成本,压缩施工进度(节省时间和金钱),同时保留维护价值和功能的核心原则。本案例研究中描述的快速VA会话将说明,橙县会议中心第五阶段扩建所使用的概念和方法进一步强调了在设计-建造概念中继续使用VA方法甚至增加使用VA方法的需求。 。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号