Analysis of the Design-Build Delivery Method in Air Force Construction Projects

机译:空军建设项目设计建造交付方式分析

获取原文
获取原文并翻译 | 示例
       

摘要

The design-build (DB) method for construction project delivery continues to grow in both the private and public sector; additionally, research has shown that the DB method outperforms the design-bid-build (DBB) method. The Air Force has applied the results of these previous research efforts to its military construction (MILCON) program without performing empirical studies to validate the approach. Therefore, the objective of this study was to compare the performance of the DB delivery method with the traditional DBB approach for the Air Force MILCON program. Data related to 835 (278 DB and 557 DBB) MILCON projects for fiscal years 1996-2006 were subsequently analyzed. The DB method had better performance in three of six metrics with the performance being significantly better for cost growth and the number of modifications per million dollars. The traditional DBB method performed significantly better in terms of total project time. Furthermore, the DB method was best suited for various facility types. This study provides empirical evidence of how the DB method provides an advantage over the traditional DBB method for Air Force MILCON projects.
机译:无论是私营部门还是公共部门,用于建设项目交付的设计-建造(DB)方法都在继续增长。此外,研究表明,DB方法的性能优于设计-出价-构建(DBB)方法。空军已将这些先前研究工作的结果应用于其军事建设(MILCON)计划,而未进行经验研究来验证这种方法。因此,本研究的目的是将DB交付方法的性能与空军MILCON计划的传统DBB方法的性能进行比较。随后分析了1996-2006财政年度与835(278 DB和557 DBB)MILCON项目相关的数据。 DB方法在六个指标中的三个指标中具有更好的性能,对于成本增长和每百万美元的修改次数而言,性能明显更好。传统的DBB方法在项目总时间方面的表现要好得多。此外,DB方法最适合各种设施类型。这项研究为空军MILCON项目提供了比传统DBB方法更具优势的经验证据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号