Partnering Process Model for Public-Sector Fast-Track Design-Build Projects in Korea

机译:韩国公共部门快速通道设计建造项目的合作过程模型

获取原文
获取原文并翻译 | 示例
           

摘要

The use of design-build project delivery in the public sector has increased rapidly since the early 1990s due to its advantages over traditional delivery methods, particularly in terms of shortening the overall project duration. Fast-track approaches are being applied to design-build projects to achieve the optimum schedule durations. While both fast-track projects and design-build project have been researched separately in the past, there is little published research on how they are truly integrated. Likewise, the research has shown the merits of partnering in design-build and fast-track projects separately, but not in an integrated model. The purpose of this study is to develop a fast-track partnering process model (FTPPM) that combines the fast-track approach with the partnering concept. The model is based on the analysis of the factors that influence successful fast-track processes. Seven key success vehicles were discovered using the factor analysis method. The FTPPM is composed of the preparation stage, the fast-track workshop stage, and the detailed design and construction stage. The activities for each stage for fast-track implementation are developed in consideration with seven key success vehicles for fast-track projects.
机译:自1990年代初以来,由于其优于传统交付方法的优势,特别是在缩短总体项目工期方面,公共部门对设计建造项目交付的使用迅速增加。快速通道方法正在应用于设计建造项目,以实现最佳的进度工期。过去,虽然快速项目和设计构建项目是分别进行研究的,但很少有关于如何真正整合的公开研究。同样,研究显示了在设计构建和快速项目中单独进行合作的优点,但在集成模型中却没有。本研究的目的是开发一种结合了快速跟踪方法和伙伴关系概念的快速跟踪伙伴过程模型(FTPPM)。该模型基于对影响成功快速通道流程的因素的分析。使用因素分析方法发现了七个成功的关键工具。 FTPPM由准备阶段,快速通道研讨会阶段以及详细的设计和构建阶段组成。考虑到快速通道项目的七个关键成功工具,制定了快速通道实施的每个阶段的活动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号