Projects controls' invisible hand has guided modern man's greatest ideas from concept to application. Although project controls does not invent or implement projects, it does make such projects possible by holding down costs, delivering faster schedules, and anticipating challenges before they become problems. Project controls' continual emphasis on gauging incremental progress (percent complete and earned value) empowers the project manager (PM) to focus limited resources toward achieving objectives. Earned value analysis begins with a calculation of BCWP (budgeted cost of work performed). In its simplest form, it is calculated by multiplying the approved baseline budget by the percent complete. The baseline budget is usually constant; the percent complete is variable.
机译:Projects Control的无形之手从概念到应用指导着现代人的伟大构想。尽管项目控制不会发明或实施项目,但确实可以通过降低成本,加快进度并在问题变成问题之前预见到挑战来使此类项目成为可能。项目控制不断强调衡量增量进度(完成和所赚取的价值百分比),使项目经理(PM)可以将有限的资源用于实现目标。挣值分析始于BCWP(已执行工作的预算成本)的计算。最简单的形式是将批准的基准预算乘以完成百分比。基准预算通常是恒定的;完成百分比是可变的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号