首页> 外文期刊>Control Engineering >PCs Control Welding of Nuclear Fuel Rod Spacers
【24h】

PCs Control Welding of Nuclear Fuel Rod Spacers

机译:PC控制核燃料棒垫片的焊接

获取原文
获取原文并翻译 | 示例

摘要

To ensure that robots safely weld components for a nuclear reactor requires monitoring and control beyond what typical technologies can offer. Advanced Nuclear Fuels (ANF) GmbH, based in Karlstein, Germany, commissioned assembly and micro-assembly technology supplier Rohwedder AG to build a state-of-the-art welding plant to produce steel grids for use as fuel rod spacers in BWR (boiling water reactor) or PWR (pressurized water reactor) nuclear plants. Critical requirements for the plant were high welding precision and accuracy coupled with high speed. During the welding process, up to 8,000 parameters must be transferred in a cycle time under 1 second for each weld point. Rohwedder chose a PC-based PLC (often referred to as a programmable automation controller or PAC) and motion control technologies from Beckhoff to handle this process.
机译:为了确保机器人安全地焊接核反应堆的组件,需要进行监视和控制,这超出了典型技术所能提供的范围。总部位于德国卡尔斯坦的先进核燃料(ANF)GmbH委托组装和微组装技术供应商Rohwedder AG建造了一家先进的焊接厂,生产钢格板,以用作BWR(沸水炉)中的燃料棒垫片(沸腾)水反应堆)或压水堆(压水堆)核电站。该工厂的关键要求是高焊接精度,精度以及高速度。在焊接过程中,每个焊接点在1秒以下的循环时间内必须传送多达8,000个参数。 Rohwedder从Beckhoff选择了基于PC的PLC(通常称为可编程自动化控制器或PAC)和运动控制技术来处理此过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号