首页> 外文期刊>Construction News >Tentative signs of improvement as less work is put on hold in April
【24h】

Tentative signs of improvement as less work is put on hold in April

机译:由于4月份的工作量减少,暂时出现了改善的迹象

获取原文
获取原文并翻译 | 示例
           

摘要

About 38 per cent less construction work was put on hold last month than in the first month of the year, figures have revealed.rnThe latest project hold statistics from business intelligence unit Glenigan show that £3.4 billion of work was brought to a halt in April compared with £5.5bn in January.rnThe figures reveal a steady improvement throughout the year to date, providing another tentative sign of encouragement for the construction industry.rnAll sectors, with the exception of civil engineering and education, saw a drop in the amount of work being delayed. But £16.9bn of work has still been put on hold in the UK since Christmas.
机译:数据显示,上个月搁置的建筑工程比今年第一个月减少了约38%。rn商业情报部门Glenigan的最新项目搁置统计数据显示,34亿英镑的工程在4月份停止了运作。相比之下,1月份为55亿英镑。rn数据显示,今年迄今全年稳步增长,为建筑业提供了又一个鼓励的迹象。rn除土木工程和教育业外,所有行业的投资额均下降了。工作被推迟了。但自圣诞节以来,英国仍有169亿英镑的工作被搁置。

著录项

  • 来源
    《Construction News》 |2009年第7118期|14-14|共1页
  • 作者

    NICK WHITTEN;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号