首页> 外文期刊>Construction News >CROSSR AIL WORK BEGINS
【24h】

CROSSR AIL WORK BEGINS

机译:横梁工作开始

获取原文
获取原文并翻译 | 示例
           

摘要

Prime Minister Gordon Brown, rail minister Lord Adonis and London mayor Boris Johnson gathered at Canary Wharf, in London Docklands, as the first foundations for a new Crossrail station were laid last week.rnMr Brown welcomed the start of the £15.9 billion cross-London rail scheme, saying: "Many people said it would never be built, but today we are celebrating a defining moment for London as Crossrail's construction gets under way."rnCrossrail, which will run from Maidenhead in Berkshire to Shenf ield in Essex, with links to Heathrow Airport and to Abbey Wood in south London, is scheduled to open in 2017.
机译:上周,总理戈登·布朗,铁路大臣阿多尼斯勋爵和伦敦市长鲍里斯·约翰逊聚集在伦敦港区的金丝雀码头,为新的Crossrail火车站的奠基奠定了基础。布朗先生对耗资159亿英镑的伦敦跨境动工表示欢迎。铁路计划说:“许多人说它将永远不会建造,但今天我们正在庆祝伦敦的一个关键时刻,因为Crossrail的建设正在进行。” Crossrail,它将从伯克郡的梅登黑德(Maidenhead)到埃塞克斯郡的申菲尔(Einfeld)运行,并提供链接飞往希思罗机场和伦敦南部的艾比伍德博物馆,预计于2017年开放。

著录项

  • 来源
    《Construction News》 |2009年第7118期|8-8|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号