首页> 外文期刊>Construction News >PROJECT FOCUS BOTANIC HOUSE
【24h】

PROJECT FOCUS BOTANIC HOUSE

机译:项目重点植物园

获取原文
获取原文并翻译 | 示例
           

摘要

Client Pace Cambridge Contact Simon Roden, associate director, 020 7251 0781, simon. roden@formationarchitects.co.uk Value £80m Details Morgan Sindall has secured the contract for the construction 156 apartments and mews houses in Cambridge. The residential units, of which 63 are affordable, are to be housed in five, six and seven-storey buildings, many with views over the Botanic Garden office. There will also be retail/food and drink provision, including retention of a public house, community space, re-location of the war memorial, provision of public art, basement car parking and servicing, external and internal amenity space, and hard and soft landscaping.
机译:客户Pace Cambridge联系人Simon Roden,副总监,电话020 7251 0781,simon。 roden@formationarchitects.co.uk价值8000万英镑详细信息Morgan Sindall已获得在剑桥建造156套公寓和Cambridge屋的合同。这些住宅单位价格适中,其中有63座,将被安置在五,六和七层的建筑物中,其中许多可以欣赏植物园办公室的景色。还将提供零售/食品和饮料,包括保留公共场所,社区空间,战争纪念馆的搬迁,公共艺术的提供,地下停车场和服务,外部和内部便利空间以及软硬兼施美化。

著录项

  • 来源
    《Construction News》 |2011年第7213期|p.23|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号