首页> 外文期刊>Construction News >Objectors cause delay to £600m Northern line extension deal
【24h】

Objectors cause delay to £600m Northern line extension deal

机译:反对者导致延期6亿英镑北线延期协议

获取原文
获取原文并翻译 | 示例
           

摘要

A £600m contract to build the Northern line extension to Battersea has been delayed by several months. According to documents presented at a Transport for London board meeting, the project has been held up by objections to the Transport Work Acts Order, which will authorise the construction of the work. Prequalification questionnaires were submitted by six consortia before TfL shortlisted four bidders in June, understood to be a Bam Nuttall/Balfour Beatty joint venture, Bechtel/Strabag, Costain/Sir Robert McAlpine and Laing O'Rourke/Ferrovial.
机译:一份价值6亿英镑的合同将北线扩建至巴特西,工程已推迟了几个月。根据伦敦运输委员会会议上提交的文件,该项目因反对《运输工作法令》而被搁置,该法令将授权该工程的施工。在6月TfL入围四名竞标者之前,这是由六个财团提交的资格预审问卷,据了解这是Bam Nuttall / Balfour Beatty合资企业,Bechtel / Strabag,Costain / Robert McAlpine爵士和Laing O'Rourke / Ferrovial。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号