首页> 外文期刊>Construction News >Big screen action at King's Cross
【24h】

Big screen action at King's Cross

机译:国王十字大屏幕动作

获取原文
获取原文并翻译 | 示例
           

摘要

Ischebeck Titan introduced full-height edge protection screens to the UK construction industry in 2005. Since then it has designed and supplied screens to a variety of projects. Appointed by main contractor Kier, Mitchellson Formwork & Civil Engineering tendered for the King's Cross B3 project early in 2012. A budget price for the screens was based on the existing Ischebeck Titan system. But it was soon apparent something more would be required to satisfy stringent safety requirements - the site is adjacent to the St Pancras and King's Cross railway termini. Client specification instructed that two adjacent edges of the 11-storey building were to be screened.
机译:Ischebeck Titan于2005年向英国建筑业推出了全高边缘防护屏风。从那时起,它就为各种项目设计并提供了防护屏风。米切尔森模板和土木工程公司由总承包商Kier任命,于2012年初竞标了国王十字B3项目。筛网的预算价格基于现有的Ischebeck Titan系统。但是很明显,要满足严格的安全要求还需要做更多的工作-该地点毗邻圣潘克拉斯和国王十字铁路总站。客户规范指示要屏蔽11层建筑物的两个相邻边缘。

著录项

  • 来源
    《Construction News》 |2014年第yearbook期|34-34|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号