首页> 外文期刊>Construction News >NI roads upgrade hits red light
【24h】

NI roads upgrade hits red light

机译:NI道路升级闯红灯

获取原文
获取原文并翻译 | 示例
           

摘要

The £160m upgrade of one of Northern Ireland's busiest roads has been put on hold after the work was challenged at the High Court. A Graham/Farrans JV was due to start dualling a stretch of road on the A6 between Londonderry and Belfast in October, but this has been delayed until a judicial review is carried out. The delay comes after ornithologist Chris Murphy challenged the scheme on environmental grounds. His challenge related to the first phase of the project, which will see the dualling of a 6.7 km section between Randalstown and Toome.
机译:在高等法院对这项工作提出质疑后,北爱尔兰最繁忙的道路之一耗资1.6亿英镑的升级工作被搁置。格雷厄姆/法兰斯合资公司原定于10月开始在伦敦德里和贝尔法斯特之间的A6公路上加长一条路,但这一直推迟到进行司法审查。鸟类学家克里斯·墨菲(Chris Murphy)以环境为由对该计划提出质疑后,这项工作才得以推迟。他的挑战与该项目的第一阶段有关,这将使Randalstown和Toome之间的6.7公里路段增加一倍。

著录项

  • 来源
    《Construction News》 |2016年第7464期|10-10|共1页
  • 作者

    JACK SIMPSON;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号