首页> 外文期刊>Construction manager >Almacantar v McAlpine: unclear pre-nup leads to messy divorce
【24h】

Almacantar v McAlpine: unclear pre-nup leads to messy divorce

机译:Almacantar v McAlpine:婚前不清楚导致离婚

获取原文
获取原文并翻译 | 示例
           

摘要

Design and build (D&B) still seems to be the method of choice for commercial projects, and pre-construction services agreements (PCSAs) are increasingly popular. There are advantages to such a two stage D&B. Developers can save time and fees working with the contractor, tapping into its supply chain, in-house and external designers, design management and programming expertise. The relationship, when it works, adds value, akin to a JV or partnering arrangement.
机译:设计和建造(D&B)似乎仍然是商业项目的首选方法,并且施工前服务协议(PCSA)越来越受欢迎。这样的两阶段D&B有很多优点。开发人员可以与承包商合作,利用其供应链,内部和外部设计师,设计管理和编程专业知识来节省时间和费用。这种关系在运作时会增加价值,类似于合资企业或合作伙伴安排。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号