Characterising nuclear decommissioning projects: an investigation of the project characteristics that affect the project performance

机译:表征核退役项目:调查影响项目绩效的项目特征

获取原文
获取原文并翻译 | 示例
           

摘要

Historically, project management research on infrastructure has mostly focused on its planning, design and construction. However, globally, more and more infrastructure, such as nuclear power plants, bridges, dams or oil rigs, are reaching their end-of-life and will soon need to be decommissioned. Decommissioning projects are long, complex and range from small projects to multi-billion megaprojects. Their costs keep increasing, while there is a limited understanding of why this happens. Nuclear Decommissioning Projects and Programmes (NDPs) are the unit of analysis of this article, due to the relevance of this sector and the number of public information available. The aim is to identify the NDP characteristics that mostly affect the NDP performance in terms of cost and time. Findings from the application of content analysis on the information collected through 35 interviews with senior practitioners highlight the importance of several NDP characteristics, including the need to have detailed knowledge of the site conditions, a good relationship with the regulatory authorities, the availability of storage facilities and stable funding.
机译:从历史上看,对基础设施的项目管理研究主要集中在其规划,设计和施工。然而,全球范围内,越来越多的基础设施,如核电站,桥梁,水坝或石油钻井平台,正在达到其寿命,并将很快需要退役。退役项目长,复杂,范围从小项目到数十亿兆画幕。他们的成本不断增加,而对这种原因有限了解。由于本行业的相关性和可用的公共信息人数,核退役项目和计划(NDPS)是本文分析的单位。目的是识别在成本和时间方面主要影响NDP性能的NDP特征。关于应用内容分析的调查结果通过35人采访的资料,高级从业者突出了几个NDP特征的重要性,包括需要详细了解现场条件,与监管机构的良好关系,储存设施的可用性稳定的资金。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号