Lock-in and its influence on the project performance of large-scale transportation infrastructure projects: investigating the way in which lock-in can emerge and affect cost overruns

机译:锁定及其对大型运输基础设施项目的项目绩效的影响:研究锁定的产生方式并影响成本超支的方式

获取原文
获取原文并翻译 | 示例
       

摘要

Lock-in, the escalating commitment of decision makers to an ineffective course of action, has the potential to explain the large cost overruns in large-scale transportation infrastructure projects. Lock-in can occur both at the decision-making level (before the decision to build) and at the project level (after the decision to build) and can influence the extent of overruns in two ways. The first involves the 'methodology' of calculating cost overruns according to the 'formal decision to build'. Due to lock-in, however, the 'real decision to build' is made much earlier in the decision-making process and the costs estimated at that stage are often much lower than those that are estimated at a later stage in the decision-making process, thus increasing cost overruns. The second way that lock-in can affect cost overruns is through 'practice'. Although decisions about the project (design and implementation) need to be made, lock-in can lead to inefficient decisions that involve higher costs. Sunk costs (in terms of both time and money), the need for justification, escalating commitment, and inflexibility and the closure of alternatives are indicators of lock-in. Two case studies, of the Betuwe-route and the High Speed Link-South projects in the Netherlands, demonstrate the presence of lock-in and its influence on the extent of cost overruns at both the decision-making and project levels. This suggests that recognition of lock-in as an explanation for cost overruns contributes significantly to the understanding of the inadequate planning process of projects and allows development of more appropriate means.
机译:锁定,即决策者对无效行动方针的不断升级的承诺,有可能解释大规模运输基础设施项目中的大量成本超支。锁定可能同时发生在决策级别(决策之前)和项目级别(决策之后),并且可能以两种方式影响超支的程度。首先涉及根据“正式决定建造”来计算成本超支的“方法”。但是,由于锁定,“真正的建造决策”是在决策过程中较早做出的,在此阶段估算的成本通常比在决策后期进行的估算低得多。流程,从而增加了成本超支。锁定会影响成本超支的第二种方式是通过“实践”。尽管需要做出有关项目(设计和实施)的决策,但是锁定可能导致效率低下的决策,从而带来更高的成本。沉没成本(在时间和金钱上),合理性的需要,不断升级的承诺,缺乏灵活性以及封闭替代品都是锁定的指标。在荷兰的Betuwe路线和High Speed-South项目中,有两个案例研究表明了锁定的存在及其对决策和项目层面的成本超支程度的影响。这表明,将锁定作为对费用超支的解释的认识,对于理解项目的不充分计划流程有很大帮​​助,并允许开发更合适的方法。

著录项

  • 来源
    《Environment and Planning》 |2010年第5期|p.792-807|共16页
  • 作者单位

    Faculty of Technology, Policy, and Management, Delft University of Technology, Jaffalaan 5, 2628 BX Delft, The Netherlands;

    rnBT Centre for Major Programme Management, Saied Business School, University of Oxford, Park End Street, Oxford OX1 1HP, England;

    rnFaculty of Technology, Policy, and Management, Delft University of Technology, Jaffalaan 5, 2628 BX Delft, The Netherlands;

    rnFaculty of Technology, Policy, and Management, Delft University of Technology, Jaffalaan 5, 2628 BX Delft, The Netherlands;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 03:37:16

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号