Beyond the causes: Rethinking mitigating measures to avert cost and time overruns in construction projects

机译:超越原因:重新考虑缓解措施,避免建设项目的成本和时间超支

获取原文
获取原文并翻译 | 示例
           

摘要

Purpose - This paper aims to contend that the circle of investigation into overruns cannot be complete unless the established critical failure factors are matched against their respective mitigating measures to avert the overruns. Extant literature is replete with factors that engender cost and time overruns within the design and construction phase. The constraint is the lack of a scientific approach in establishing a tackling mechanism to address the root causes and stakeholder responsibilities. Design/methodology/approach - The research is based on nine unique grand factors previously established and reported in literature about the Ghanaian Construction Industry. A focus group discussion convened through a purposive sampling technique led to the establishment of a list of mitigating measures and strategies. Findings - The paper established a checklist of 114 mitigating measures categorised into preventive, predictive and corrective approaches. Additionally, several short to medium term key strategies have been recommended to avert the occurrence of cost and time overruns. Originality/value - The mitigating measures can be adopted as a checklist of good practice to help practitioners enhance the effectiveness of project budget and schedule control. It is also supposed to serve as a guide to practitioners in averting overruns through predictive, preventive and/or corrective causes.Aunique approach in averting the occurrence of cost and time overruns.
机译:目的-本文旨在辩称,除非已建立的关键失效因素与它们各自的缓解措施相匹配,以防止超支,否则无法完成对超支的调查圈。现有文献中充斥着在设计和施工阶段导致成本和时间超支的因素。制约因素是在建立解决机制以解决根本原因和利益相关者责任方面缺乏科学方法。设计/方法论/方法-该研究基于九个独特的主要因素,这些因素先前已建立并在有关加纳建筑业的文献中进行了报道。通过有目的的抽样技术召集的焦点小组讨论导致建立了一系列缓解措施和策略。调查结果-该文件建立了清单114项缓解措施的清单,这些措施分为预防,预测和纠正方法。此外,已经推荐了几种短期到中期的关键策略来避免成本和时间超支的发生。创意/价值-缓解措施可以作为良好实践的清单,以帮助从业人员提高项目预算和进度控制的有效性。它也应作为从业人员通过预测,预防和/或纠正原因避免超支的指南。避免成本和时间超支发生的独特方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号