首页> 外文期刊>Construction Europe >The installation challenge
【24h】

The installation challenge

机译:安装挑战

获取原文
获取原文并翻译 | 示例
           

摘要

The EU stage IIIB/US Tier 4 Interim laws that came into force at the start of 2011 required all manufacturers of diesel engines for construction equipment to introduce aftertreatment systems, and the need to accommodate new and large components into the equipment has been a major challenge for the industry. Italian manufacturer of track mobile crushers Omtrack, part of the Belgian Keestrack group, worked with John Deere to install its first EU stage IIIB/US Tier 4 Interim engine into one of its Argo Mobile Jaw crushers. With a peak power of 164kW, the Powertech Plus 6068HFC94 diesel engine uses EGR and a DPF to meet the 2011 emissions laws. The engine is 1.16m long and the DPF has a diameter of 320mm and is 823mm long.
机译:于2011年初生效的欧盟IIIB / US Tier 4 Interim临时法律要求所有用于建筑设备的柴油发动机制造商都必须引入后处理系统,并且需要在设备中容纳新的大型部件一直是一个重大挑战为行业。比利时Keestrack集团的一部分,意大利履带移动式破碎机制造商Omtrack与John Deere合作,将第一台欧盟Stage IIIB / US Tier 4 Interim发动机安装到其中的Argo Mobile Jaw破碎机中。 Powertech Plus 6068HFC94柴油发动机的峰值功率为164kW,使用EGR和DPF满足2011年排放法规。发动机长1.16m,DPF直径为320mm,长823mm。

著录项

  • 来源
    《Construction Europe》 |2012年第1期|p.39|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号