Sorell Causeway, Tasmania-precasting for long life

机译:塔斯马尼亚州Sorell Causeway-预制,使用寿命长

获取原文
获取原文并翻译 | 示例
           

摘要

Designed by consultants GHD and built by John Holland, the 46om-long structure consists of 18 spans, each of 25.5m (Figures 1 and 2). Contract value is AU$18.7 million. The causeway, which is across an environmentally sensitive waterway, was opened to traffic in December 2002. It replaces a bridge from 1957, also built by John Holland, which was the largest prestressed structure built in Australia at that time. A feature of the old bridge is that the voids for the tendons were created using inflated rubber tubes that were withdrawn after the concrete had hardened. Because of serious deterioration of this bridge caused by chloride ingress, the owner awarded a design/build contract for its removal and replacement in 2001. The old bridge will be demolished now that the new one is carrying traffic. The causeway has been designed for two lanes of M1600 design loading to the Australian Bridge Design Code. This loading is thought by the author to be the heaviest 'everyday' design vehicle specified anywhere in the world, and does not correspond to an 'abnormal' or 'special' vehicle.
机译:46毫米长的结构由GHD顾问设计,由John Holland建造,由18个跨度组成,每个跨度为25.5m(图1和2)。合同价值为1,870万澳元。该堤道横跨一条对环境敏感的水道,于2002年12月开放通车。它取代了1957年建造的桥梁,该桥也是约翰·霍兰德建造的,当时是当时澳大利亚最大的预应力结构。旧桥的一个特点是,使用充气的橡胶管为肌腱形成空隙,在混凝土硬化后将其撤回。由于该桥梁因氯化物的侵入而导致严重恶化,业主在2001年为其拆除和更换了一份设计/建造合同。由于新桥承载了交通,旧桥将被拆除。该堤道已设计为两条装载到澳大利亚桥梁设计规范的M1600设计车道。作者认为这种载荷是世界上任何地方指定的最重的“日常”设计车辆,并不对应于“异常”或“特殊”车辆。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号