首页> 外文期刊>Computers & Structures >Analysis of cable-stayed bridges during construction by cantilever methods
【24h】

Analysis of cable-stayed bridges during construction by cantilever methods

机译:悬臂法施工斜拉桥分析

获取原文
获取原文并翻译 | 示例

摘要

The aim of this study concerns with the analysis of cable-stayed bridges at different erection stages during construction using the cantilever method. A finite element computation procedure is set up for the shape finding analysis of such structures during erection procedures. Two computational processes are established, one is a forward process analysis and the other is a backward process analysis. The former is performed by following the sequence of erection stages in bridge construction and the latter is carried out in the reverse direction of erection procedures. Both processes can be successfully applied for finding the initial shape of bridge structures during erection procedures. The structural behavior of the bridge structure at different erection stages has been examined in details, such as the pretension required in cable-stays and the corresponding structural configurations of the bridge, etc. The results of shape finding analysis at each erection stage not only provide the necessary data for the purpose of structural analysis and design, but also can be used for checking and controlling the erection procedure of the cable-stayed bridge during construction. The designed shape (pretension in cables and configuration) of the bridge can then be achieved and constructed.
机译:这项研究的目的是利用悬臂法在施工过程中不同阶段的斜拉桥分析。建立了有限元计算程序,用于在安装过程中对此类结构进行形状发现分析。建立了两个计算过程,一个是正向过程分析,另一个是反向过程分析。前者是按照桥梁施工中的安装阶段顺序进行的,而后者则是按照相反的安装过程进行的。这两个过程都可以成功地应用于在安装过程中寻找桥梁结构的初始形状。已详细检查了桥梁结构在不同安装阶段的结构行为,例如,斜拉索所需的预应力以及桥梁的相应结构配置等。在每个安装阶段进行形变分析的结果不仅提供了用于结构分析和设计的必要数据,也可用于检查和控制斜拉桥在施工过程中的安装过程。然后可以实现并构造桥的设计形状(电缆和配置中的预紧力)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号