...
首页> 外文期刊>Computers & Chemical Engineering >An improved formulation for scheduling an automated wet-etch station
【24h】

An improved formulation for scheduling an automated wet-etch station

机译:用于计划自动湿蚀刻站的改进公式

获取原文
获取原文并翻译 | 示例

摘要

Wet-etching is a key step in wafer fabrication. An automated wet-etch process involves a complex interplay of zero wait and no-intermediate-storage policies, and a shared robot; and poses a challenging scheduling problem. In this paper, we reformulate a previously reported mixed integer linear programming (MILP) model for minimizing the makespan in an automated wet-etch station. Extensive numerical evaluation shows that the reformulations outperform their predecessors by a significant margin. Interestingly, this improvement in performance arises merely from a slightly redefined binary variable. We also present an effective empirical formula for ranking MILP models in a situation where assessing alternate models is difficult due to the absence of an outright winner, and problem- as well as machine-dependent relative performances of models.
机译:湿蚀刻是晶圆制造中的关键步骤。自动化的湿法蚀刻过程涉及零等待和无中间存储策略以及共享的机械手的复杂相互作用。并带来了具有挑战性的调度问题。在本文中,我们重新制定了先前报道的混合整数线性规划(MILP)模型,以最小化自动湿法蚀刻站中的制造期。大量的数值评估表明,新配方的性能大大优于其前代产品。有趣的是,性能的提高仅源于稍微重新定义的二进制变量。我们还提出了一种有效的经验公式,用于在由于缺乏直接赢家,模型存在问题以及与机器相关的相对性能而难以评估备用模型的情况下对MILP模型进行排名的情况。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号