首页> 外文期刊>Computers and Geotechnics >Performance assessment and optimization of seepage control system: A numerical case study for Kala underground powerhouse
【24h】

Performance assessment and optimization of seepage control system: A numerical case study for Kala underground powerhouse

机译:渗流控制系统的性能评估和优化:Kala地下厂房的数值案例研究

获取原文
获取原文并翻译 | 示例

摘要

The Kala Hydropower Station, planned in the middle reach of Yalong River in China, consists of a large-scale cavern system for water conveyance and power generation. The construction site is characteristic of difficult geological conditions and is rich in groundwater, and the control of groundwater flow in the surrounding rocks of the underground caverns becomes one of the key technological issues. This case study presents a systematic performance assessment of the seepage control system designed for the underground caverns by finite element numerical modeling, with particular concerns on geological characterization of the site and quantitative determination of the excavation-induced variation in hydraulic conductivity of the surrounding rock masses. The significant influence of the excavation-induced permeability variation on the seepage field in the surrounding rocks and the overall behaviors of the seepage control system are comprehensively illustrated by the numerical results, and the optimized design parameters are suggested for the drainage system. The methodology presented in this study is useful for understanding the performance of the seepage control system widely deployed in underground powerhouse engineering.
机译:计划在中国雅long江中游的卡拉水电站由一个大型洞穴系统组成,用于输水和发电。施工现场具有地质条件恶劣的特点,地下水丰富,控制地下洞室围岩中的地下水流成为关键技术问题之一。本案例研究通过有限元数值模型对地下洞室渗流控制系统进行了系统性能评估,特别是有关场地的地质特征和定量确定开挖引起的围岩水力传导率变化的问题。 。数值结果全面地说明了开挖引起的渗透率变化对围岩渗流场的显着影响以及渗流控制系统的整体性能,并提出了排水系统的优化设计参数。这项研究中提出的方法对于理解广泛应用于地下厂房工程中的防渗系统的性能很有用。

著录项

  • 来源
    《Computers and Geotechnics》 |2014年第1期|306-315|共10页
  • 作者单位

    State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University, Wuhan 430072, China Key Laboratory of Rock Mechanics in Hydraulic Structural Engineering (Wuhan University), Ministry of Education, Wuhan 430072, China;

    State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University, Wuhan 430072, China Key Laboratory of Rock Mechanics in Hydraulic Structural Engineering (Wuhan University), Ministry of Education, Wuhan 430072, China;

    State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University, Wuhan 430072, China Key Laboratory of Rock Mechanics in Hydraulic Structural Engineering (Wuhan University), Ministry of Education, Wuhan 430072, China;

    State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University, Wuhan 430072, China Key Laboratory of Rock Mechanics in Hydraulic Structural Engineering (Wuhan University), Ministry of Education, Wuhan 430072, China;

    State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University, Wuhan 430072, China Key Laboratory of Rock Mechanics in Hydraulic Structural Engineering (Wuhan University), Ministry of Education, Wuhan 430072, China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Performance assessment; Seepage control; Variational inequality; Underground powerhouse; Kala Hydropower Station;

    机译:绩效评估;防渗;变分不平等;地下厂房;卡拉水电站;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号