首页> 外文期刊>Computer-Aided Civil and Infrastructure Engineering >Uncertainty Processing and Risk Monitoring in Construction Projects Using Hierarchical Probabilistic Relational Models
【24h】

Uncertainty Processing and Risk Monitoring in Construction Projects Using Hierarchical Probabilistic Relational Models

机译:层次概率关系模型在建设项目不确定性处理与风险监测中的应用

获取原文
获取原文并翻译 | 示例
           

摘要

Construction projects do not often reach their expected results regarding time, cost, and quality, due to the internal and external environment variations. Despite a substantial literature about risk management, no generic approach is proposed to represent construction project considering together technical and human dimensions or sustainability with their uncertainties. Modeling complex dynamical systems from heterogeneous pieces of knowledge varying in precision and reliability is a challenging task. This article proposes an innovative generic and versatile approach, based on the formalism of hierarchical probabilistic relational models to analyze and to propagate uncertainty in construction project regarding different levels of knowledge. The aim is to obtain a flexible, portable, and versatile model able to simulate the behavior of complex system's entities involved in any construction project at different levels of detail while taking uncertainty into account. To illustrate and highlight this approach, an academic example and a real case are proposed.
机译:由于内部和外部环境的变化,建设项目通常不会在时间,成本和质量方面达到预期的结果。尽管有大量关于风险管理的文献,但仍未提出一般方法来代表建设项目,同时考虑到技术和人员方面或可持续性及其不确定性。从精度和可靠性各不相同的异构知识中建模复杂的动力学系统是一项艰巨的任务。本文基于层次概率关系模型的形式主义,提出了一种创新的通用且通用的方法,以分析和传播关于不同知识水平的建筑项目中的不确定性。目的是获得一种灵活,可移植且通用的模型,该模型能够在考虑到不确定性的情况下,以不同的详细程度模拟参与任何建设项目的复杂系统实体的行为。为了说明和强调这种方法,提出了一个学术实例和一个实际案例。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号