...
首页> 外文期刊>Civil Engineering >Security-Related Traffic Changes on George Washington Bridge Accelerated Structural Cracking
【24h】

Security-Related Traffic Changes on George Washington Bridge Accelerated Structural Cracking

机译:乔治华盛顿大桥上与安全相关的交通变化加速了结构裂缝

获取原文
获取原文并翻译 | 示例
           

摘要

The Decision implemented by the Port Authority of New York and New Jersey in the aftermath of the terrorist attacks of September 11, 2001, to confine all truck traffic on the George Washington Bridge to the upper deck had the unintended consequence of accelerating the number of cracks occurring in key structural supports for that orthotropic steel deck, explains Robert Kumapley, P.E., M.ASCE, a senior engineer in the Newark, New Jersey, office of the Port Authority, the bridge's owner.
机译:纽约和新泽西港务局在2001年9月11日恐怖袭击发生后实施的将乔治华盛顿大桥上所有卡车运输限制在上层甲板上的运输决定的产生,意想不到的结果是加速了裂缝数量PE,M.ASCE,桥梁所有者的新泽西州纽瓦克市,港口管理局办公室的高级工程师罗伯特·库马普利(Robert Kumapley)解释说。

著录项

  • 来源
    《Civil Engineering》 |2011年第12期|p.2426-31|共7页
  • 作者

    ROBERT L. REID;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号