首页> 外文会议>25th Annual International Bridge Conference: IBC 2008: Home of the Bridge industry >Accelerated Bridge Re-Decking of Bridges on the George Washington Memorial Parkway
【24h】

Accelerated Bridge Re-Decking of Bridges on the George Washington Memorial Parkway

机译:乔治华盛顿纪念公园大道上的桥梁加速桥梁重新装饰

获取原文
获取原文并翻译 | 示例

摘要

The need to replace severely deteriorated bridge decks is one of our Nation's top priorities. With limited funding and high volumes of traffic, cost-effective accelerated bridge construction methods must be utilized to deliver new decks with minimal impact to the traveling public. Precast concrete deck panels have been used successfully by the FHWA - Eastern Federal Lands Highway Division for the National Parks Service on the George Washington Memorial Parkway to accomplish these goals.
机译:更换严重恶化的桥面板是我们国家的当务之急。在资金有限且交通繁忙的情况下,必须采用具有成本效益的加速桥梁建造方法来交付新甲板,而对出行公众的影响却最小。 FHWA-联邦华盛顿土地联邦公路局(George Washington Memorial Memorial Parkway)的国家公园管理局已经成功地使用了预制混凝土面板。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号