首页> 外文期刊>Canal boat and inland waterways >Bold target for Wey & Arun
【24h】

Bold target for Wey & Arun

机译:Wey&Arun的大胆目标

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Fresh from celebrating the completion of work to rebuild Southland Lock (pictured) on the restored length of canal near Alfold, Surrey, the Wey & Arun Canal Trust is now planning Its next project to replace a causeway which at present blocks through navigation with a new bridge. However, to do this, it needs to raise £700,000 in total. An appeal has been launched with an initial target of £180,000 by the end of this year, so work can start on Compasses Bridge next April.
机译:Wey&Arun Canal Trust刚刚庆祝完工,在萨里(Surrey)的Alfold(萨里)Alfold附近恢复了运河的长度上重建了Southland Lock(如图),现在,Wey&Arun Canal Trust正在计划其下一个项目,以替换目前正在通航的新堤道。桥。但是,为此,它需要总共筹集700,000英镑。上诉已经启动,最初的目标是在今年年底之前达到18万英镑,因此明年4月可以在Compasses Bridge开始工作。

著录项

  • 来源
    《Canal boat and inland waterways》 |2014年第9期|11-11|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号