【24h】

Old Wey Bridge refurbishment

机译:旧韦桥翻新工程

获取原文

摘要

This paper presents how Surrey County Council (SCC) refurbished a Grade II listed cast-iron bridge. It highlights the history of the bridge, the importance of the bridge in term of its uniqueness and position in the road network of the county. The paper also covers the result of the live load assessment carried out on the bridge, the various remedial options considered, and the many organisations / bodies consulted as mandated by statue or goodwill. The paper also describes the refurbishment work that was carried out together with comments received from the stakeholders.
机译:本文介绍了萨里郡议会(SCC)如何翻新了二级保护的铸铁桥梁。它突出了桥梁的历史,桥梁的重要性(从其独特性和在县城路网中的位置)。本文还涵盖了在桥梁上进行的活荷载评估的结果,所考虑的各种补救方案以及根据法规或商誉要求咨询的许多组织/机构。本文还介绍了翻新工作以及从利益相关者那里收到的意见。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号