...
首页> 外文期刊>Canal boat and inland waterways >Go-ahead for new Chesterfield terminus
【24h】

Go-ahead for new Chesterfield terminus

机译:继续前往切斯特菲尔德的新终点站

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Plans to create a terminus for a restored Chesterfield Canal as part of a major urban regeneration scheme for Chesterfield have taken a step forward with planning approval of the £75m first stage of the scheme. With the original basin filled in, the restored five-mile length from Staveley to Chesterfield ends with a short length of the River Rother in a formerly industrial area. Plans to create a new terminus led to excavation of a basin several years ago, but the entrance lock is yet to be built, and there has been little progress on the surrounding regeneration.
机译:作为切斯特菲尔德重大城市更新计划的一部分,计划为已修复的切斯特菲尔德运河创建终点站,该计划的第一阶段费用为7500万英镑,计划已获批准。原来的盆地被填满后,从斯塔夫利到切斯特菲尔德的恢复了五英里长,而在以前的工业区中,拉尔特河则变短了。建造新终点站的计划导致了几年前对盆地的开挖,但是入口锁尚未建立,周围的再生工作进展甚微。

著录项

  • 来源
    《Canal boat and inland waterways》 |2017年第2期|11-11|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号