首页> 外文期刊>Canal boat and inland waterways >...and seven years of engineering
【24h】

...and seven years of engineering

机译:...和七年的工程

获取原文
获取原文并翻译 | 示例
           

摘要

IN ADDITION to the dredging contract, the Canal & River Trust has signed a new seven-year contract for almost 1,000 pieces of mechanical and electrical engineering across the waterways network. The contract has been awarded to AMCO, replacing separate current contracts for mechanical and electrical maintenance, water and automation, and covering maintenance, renewal, replacement and upgrades. CRT said that a single contract would mean "major advantages in terms of improved efficiency and customer service". The individual items covered range from individual opening bridges and mechanised locks up to large structures including the Anderton Boat Lift and Tees Barrage.
机译:除疏contract合同外,Canal&River Trust还签署了一份为期七年的新合同,内容涉及整个航道网络中近1,000台机电工程。该合同已授予AMCO,代替了当前的机电和维护,水和自动化合同,涵盖了维护,更新,更换和升级。 CRT说,一份合同将意味着“在提高效率和客户服务方面的主要优势”。涵盖的单个项目从单个的打开桥和机械锁到大型结构,包括安德顿船艇升降机和Tees Barrage。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号