...
首页> 外文期刊>Canadian civil engineer >Bridge Rapid Replacement with Self-propelled Modular Transporters
【24h】

Bridge Rapid Replacement with Self-propelled Modular Transporters

机译:自行式模块化运输车快速更换桥梁

获取原文
获取原文并翻译 | 示例
           

摘要

Highway 417 is a major freeway running through the City of Ottawa, Ontario, Canada. Constructed between 1959 and 1967, the freeway carries more than 150,000 vehicles each day. Five of the twin bridges carrying eastbound and westbound traffic along the corridor are nearing the end of their expected lifespan with severe deck deterioration and are in need of rehabilitation or replacement. The Ontario Ministry of Transportation (MTO) retained McCormick Rankin Corporation (MRC) to design the replacement of these bridges in conjunction with a major reconstruction/ widening of Highway 417.
机译:417号高速公路是贯穿加拿大安大略省渥太华市的主要高速公路。这条高速公路建于1959年至1967年之间,每天运送超过15万辆汽车。沿走廊向东和向西行驶的双桥中,有五座正在接近预期寿命,甲板严重恶化,需要修复或更换。安大略省交通运输部(MTO)保留了麦考密克兰金公司(MRC)来设计这些桥梁的更换,同时对417号高速公路进行重大改建/拓宽。

著录项

  • 来源
    《Canadian civil engineer》 |2011年第1期|p.14-1731|共5页
  • 作者

    Michel Yachon; Qnazi Islam;

  • 作者单位

    McCormick Rankin Corporation Ottawa, Ontario;

    Head Structural Section, Eastern Region Ontario Ministry ot Transportation, Kingston, Ontario;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号