首页> 外文期刊>Buildings >Correctional Center Combines Sustainability and Efficiency
【24h】

Correctional Center Combines Sustainability and Efficiency

机译:惩教中心结合了可持续性和效率

获取原文
获取原文并翻译 | 示例
       

摘要

The Goose Creek Correctional Center (GCCC) emulates a small city to better prepare inmates for community reentry upon their release. This medium security prison houses 1,536 inmates throughout the five-building complex. The entire project team was engaged from the onset in an integrated design-build process, which parallels design and construction within the same project schedule. This approach expedites utility work ahead of architecture and system trim-outs. The methodology likely took two years off of project delivery over the traditional design-bid-build method, estimates John Yost, GCCC's maintenance superintendent.
机译:鹅溪惩教中心(GCCC)模仿了一个小城市,以为囚犯在释放后为社区重返做准备。这个中等安全的监狱在整个五栋大楼中共收容1,536名囚犯。整个项目团队从一开始就参与了一个集成的设计-构建过程,该过程在同一项目进度表中并行进行设计和构建。这种方法在架构和系统调整之前加快了实用程序的工作。 GCCC的维护主管John Yost估计,该方法可能比传统的设计—投标—建造方法要花两年的时间。

著录项

  • 来源
    《Buildings》 |2013年第10期|56-56|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 23:54:44

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号