DOWNSOUTH CONSTRUCTIONS v JIGSAW CORPORATE CHILDCARE

机译:DOWNSOUTH CONSTRUCTIONS诉JIGSAW Corporate CHILDCARE

获取原文
获取原文并翻译 | 示例
       

摘要

Thus, Jigsaw's challenges to the determination fail. However, there are other aspects of Jigsaw's notice of motion that have not been dealt with (because the parties only argued those aspects going to the enforceability of the determination and the judgment based upon it). Clearly enough, Downsouth should have its costs to date. However, having regard in part to the drafting of the notice of motion and in part to the way the hearing before me proceeded, the only order that I make is to stand the proceedings over to 9.30 am on 28 June 2007 before me for the parties to bring in short minutes of order to give effect to these reasons and to provide for any further hearing under Jigsaw's notice of motion.
机译:因此,拼图对决定的挑战失败了。但是,拼图运动通知中的其他方面尚未处理(因为当事方仅争论那些与确定性和基于判决的可执行性有关的方面)。显然,Downsouth应该拥有迄今为止的成本。但是,考虑到部分动议通知书的起草以及部分在我面前进行的听证会的方式,我唯一下达的命令是将当事方于2007年6月28日上午9.30移交给当事方为了使这些理由生效并在拼图活动通知下进行进一步的听证会,请花几分钟时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号