DELAY AND DISRUPTION IN CONSTRUCTION CONTRACTS

机译:施工合同的延误与破坏

获取原文
获取原文并翻译 | 示例
       

摘要

Delay and Disruption in Construction Contracts by Keith Pickavance (4th ed, Sweet & Maxwell, 2010), 1274 pages (including index and tables), RRP: £320 What a wonderful, well-rounded and in-depth worth this very authoritative text has matured into. The very learned author has given the profession a splendid encyclopaedia on not just his vast expertise in respect of delay and disruption but also in respect of the several relevant risk categories. For example, in respect of the legal risk, he gives a reminder of the potential danger in amending standard forms inappropriately; as well as on the other side of the ledger, in failing to do so when addition of amendment is not only necessary but, indeed, invited. In respect of the vast field of design risk, he deals with the dangers of accelerating design schedules and the failure to observe any relevant duty to warn. Similarly, the author canvasses the many dangers and risks relating to different types of project procurement beyond basic design and construct. The treatment of time and cost is far from just theoretical; quite to the contrary, there is very helpful advice on the necessity for appropriate and proper drafting, well illustrated by the quotation from Pascal, viz:
机译:Keith Pickavance的《建筑合同的延误与破坏》(第4版,Sweet&Maxwell,2010年),1274页(包括索引和表格),建议零售价:320英镑,这本非常权威的著作具有多么奇妙,全面而深入的价值成熟。博学多才的作者不仅对延迟和中断方面的丰富专业知识,而且对几种相关风险类别的专业知识都给予了出色的百科全书。例如,关于法律风险,他提醒人们不适当修改标准表格的潜在危险;以及在分类账的另一端,这样做不仅没有必要,而且确实有必要添加修正案。在广阔的设计风险领域中,他处理加快设计进度和不遵守任何相关警告义务的危险。同样,作者探讨了与不同类型的项目采购有关的许多危险和风险,这些风险和风险超出了基本设计和构造。时间和成本的处理远非只是理论上的。恰恰相反,关于适当和适当起草的必要性,有非常有益的建议,Pascal的话充分说明了这一点,即:

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号