首页> 外文期刊>Building and construction law >JKC AUSTRALIA LNG PTY LTD v CH2M HILL COMPANIES LTD
【24h】

JKC AUSTRALIA LNG PTY LTD v CH2M HILL COMPANIES LTD

机译:JKC Australia Lng Pty Ltd V CH2M Hill Companies Ltd

获取原文
获取原文并翻译 | 示例
           

摘要

On 18 March 2020, as a result of the COVID-19 pandemic, the Chief Justice of Western Australia issued a public notice. Among other things the notice informed the public of directions, effective immediately, as to the conduct of hearings in the Court of Appeal. Unless otherwise ordered, all appearances in person at appeal hearings were suspended. Appeal hearings, both criminal and civil, are to be conducted by telephone unless all counsel have access to video conferencing facilities (which may then be used). Those arrangements have been implemented from 19 March 2020. On 19 March 2020, the respondents in the appeal (the respondents), by interim application, applied for an order that the appeal hearing listed for 27 March 2020 be adjourned. The application was grounded on issues said to arise from the COVID-19 pandemic.
机译:2020年3月18日,由于Covid-19大流行,西澳大利亚的首席大法官发布了公告。除其他事项之外,通知通知公众,立即有效,就上诉法院的听证会。除非另有订购,否则暂停上诉听证会的所有出场。诉讼听证会,刑事和民事,除非所有律师都可以访问视频会议设施(然后可以使用)。这些安排已于2020年3月19日实施.2020年3月19日,上诉(受访者)的受访者申请临时申请申请下载于2020年3月27日上市的上诉听证会休会。该申请基于问题所说的据称,从Covid-19大流行中出现。

著录项

  • 来源
    《Building and construction law》 |2020年第2期|113-118|共6页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号