首页> 外文期刊>Bergsmannen med Jernkontorets Annaler >M1000 Malmberget's third main level
【24h】

M1000 Malmberget's third main level

机译:M1000 Malmberget的第三个主要等级

获取原文
获取原文并翻译 | 示例
       

摘要

This will be the third such level in Malmberget. Main level number one, at the 600 metre level, was commissioned in 1969. The second and current main level, M-85, started operating in 1989, and will cease to be productive by 2002. When M1000 is operational in 2000, the productive ore base will be an estimated 130 million tonnes of crude ore, giving the new main level a probable working life of about 10 years. 'The crusher and conveyor line will be in operation by September, 1999. We will start by hauling waste rock on the new line. This will enable us to test the new plant under realistic conditions, prior to the start of production in 2000,' explains M1000 project manager, Bo Bergstrom.
机译:这将是Malmberget中的第三个此类级别。第一主级是600米级别,于1969年投入使用。第二级和当前主级M-85于1989年开始运行,到2002年将停止生产。当M1000在2000年投入生产时,矿石量估计为1.3亿吨粗矿石,使新的主要矿层的使用寿命约为10年。 '破碎机和输送机生产线将于1999年9月投入运营。我们将从在新生产线上拖运废石开始。 M1000项目经理Bo Bergstrom解释说,这将使我们能够在2000年开始生产之前,在现实条件下对新工厂进行测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号