首页> 外文期刊>Aviation maintenance >Delayed Re-Delivery of Leased Aircraft Can Maintenance Managers Do More?
【24h】

Delayed Re-Delivery of Leased Aircraft Can Maintenance Managers Do More?

机译:租用飞机的重新交付延迟维修经理可以采取更多措施吗?

获取原文
获取原文并翻译 | 示例
           

摘要

The general and positive mood of the airtransport economy with spectacular numbers of aircraft orders exceeding the 500 barrier at the Dubai Air Show this fall is indeed good news. A large proportion of these new aircraft will undoubtedly fall under leasing contracts. It is a common fact that more than 80 percent of aircraft re-deliveries following the end of an operating lease are delayed by seven days or more. The overarching causes of these delays invariably fall within the remit of aircraft minimum return conditions, and the more mundane duties surrounding continuing airworthiness and their associated practicalities. It is not often appreciated by aircraft maintenance managers that the issues surrounding aircraft re-delivery should be considered even before the new aircraft is specified and much less delivered.
机译:航空运输业的总体乐观情绪令人鼓舞,今年秋天迪拜航空展上的飞机订单数量超过了500架,确实是个好消息。这些新飞机的很大一部分无疑将属于租赁合同。一个普遍的事实是,超过80%的飞机重新租赁在运营租赁期结束后会延迟7天或更长时间。这些延误的总体原因总是落在飞机最低返航条件的范围之内,以及围绕持续适航性及其相关实用性的更为平凡的职责。飞机维修经理常常不理解,甚至在指定新飞机并且少交付之前就应该考虑围绕飞机重新交付的问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号