首页> 外文期刊>IEEE transactions on automation science and engineering >Optimal Day-Ahead Operation Considering Power Quality for Active Distribution Networks
【24h】

Optimal Day-Ahead Operation Considering Power Quality for Active Distribution Networks

机译:主动配电网考虑电能质量的最佳提前​​运行

获取原文
获取原文并翻译 | 示例
           

摘要

Battery energy storage (BES) and distributed generation (DG) play an important role in active distribution networks. However, harmonic problems could be caused by the inverters in BES and DG, resulting in a poor power quality (PQ). In addition, ensuring acceptable voltage unbalance level is also another crucial PQ issue in distribution networks. Therefore, in this paper, an optimal distribution network operational model (ODNOM) is proposed to consider PQ problems caused by BES and DG. In this model, additional network power losses due to harmonics are considered into the objective function, and the harmonic constraints and voltage unbalance constraints are also taken into account. The particle swarm optimization is used to solve the proposed ODNOM. The simulations on the IEEE 13-bus, IEEE 37-bus, and IEEE 123-bus systems show that a satisfactory PQ can be achieved by the proposed approach while optimizing the total branch active power losses.
机译:电池能量存储(BES)和分布式发电(DG)在有源配电网中扮演重要角色。但是,BES和DG中的逆变器可能引起谐波问题,从而导致不良的电能质量(PQ)。此外,确保可接受的电压不平衡水平也是配电网络中另一个至关重要的PQ问题。因此,本文提出了一种最优配电网运行模型(ODNOM)来考虑由BES和DG引起的PQ问题。在该模型中,由于谐波引起的额外网络功率损耗被纳入目标函数,并且还考虑了谐波约束和电压不平衡约束。粒子群优化用于解决提出的ODNOM。在IEEE 13总线,IEEE 37总线和IEEE 123总线系统上的仿真显示,通过所提出的方法可以实现令人满意的PQ,同时优化总分支有功功率损耗。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号