首页> 外文期刊>Automation in construction >Experience mining based on case-based reasoning for dispute settlement of international construction projects
【24h】

Experience mining based on case-based reasoning for dispute settlement of international construction projects

机译:基于案例推理的国际工程争议解决经验挖掘

获取原文
获取原文并翻译 | 示例
           

摘要

Considering the experience-orientation of the construction industry, the valuable experience of similar historical cases is important reference to resolve new problems, while research concerning this issue in dispute settlement is still relatively scarce. The objectives of this study are to (1) propose a pragmatic method for generating dispute settlement for international construction projects based on Case-Based Reasoning (CBR); and (2) validate the CBR model by a specific dispute case. To achieve the research objectives, successful historical cases are collected, and attributes that influence dispute-related problems are derived. A two-step refinement process is then conducted to extract similar cases. Finally, a dispute case in Ethiopia is used to demonstrate the application of developed model. This innovative dispute settlement model enriches the theoretical framework in the field of experience mining for decision maker, and the selected experiences provide an effective reference to resolve new dispute problems and reduce the transaction costs of dispute settlement.
机译:考虑到建筑业的经验导向,类似历史案例的宝贵经验对于解决新问题具有重要的参考意义,而在争端解决中对此问题的研究仍相对较少。这项研究的目的是:(1)提出一种基于案例推理(CBR)的国际建设项目争议解决实用方法; (2)通过特定的争议案例验证CBR模型。为了达到研究目的,收集成功的历史案例,并得出影响争议相关问题的属性。然后进行两步优化过程以提取相似的案例。最后,以埃塞俄比亚的一个纠纷案为例,说明了开发模型的应用。这种创新的纠纷解决模型丰富了决策者的经验挖掘领域的理论框架,所选择的经验为解决新的纠纷问题和减少纠纷的交易成本提供了有效的参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号