首页> 外文期刊>Atomic Energy >RISK CLASSIFICATION AS A NECESSARY MANAGEMENT ELEMENT IN NUCLEAR POWER PROJECTS
【24h】

RISK CLASSIFICATION AS A NECESSARY MANAGEMENT ELEMENT IN NUCLEAR POWER PROJECTS

机译:风险分类是核电项目中必要的管理要素

获取原文
获取原文并翻译 | 示例
       

摘要

The need for a systems approach to risk determination and classification during the implementation of projects in nuclear power is substantiated, since this is the most important stage in the generally accepted approaches to risk analysis and management. Variants of risk determination and classification over the entire life cycle are examined for NPPs with the most characteristic factors, specifically, the human factor, singled out. The importance of the strategic-risk group is underscored. Each individual risk must be perceived not independently but as part of the whole project.
机译:在核电项目实施过程中,对确定风险和分类风险的系统方法的需求得到了证实,因为这是公认的风险分析和管理方法中最重要的阶段。对于具有最大特征因素(特别是人为因素)的NPP,检查了整个生命周期中风险确定和分类的变化。强调了战略风险小组的重要性。每个风险都不应该被独立地视为整个项目的一部分。

著录项

  • 来源
    《Atomic Energy》 |2014年第2期|144-149|共6页
  • 作者单位

    State Institute of Management, Moscow;

    National Research Center Kurchatov Institute, Moscow;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:39:18

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号