...
首页> 外文期刊>Asia-Pacific Journal of Operational Research >ECONOMIC REPLENISHMENT PLAN WITH IMPERFECT PRODUCTION PROCESS AND BUSINESS-RETURN DEPENDENT DEMAND
【24h】

ECONOMIC REPLENISHMENT PLAN WITH IMPERFECT PRODUCTION PROCESS AND BUSINESS-RETURN DEPENDENT DEMAND

机译:生产过程不完善且依赖于业务回报的经济补充计划

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

This study considers the supplier's warranty return and the buyer's rebate policy as business-return policy in the supplier-buyer supply chain. The policy as well as the displayed stock level influences the behavior of the buyer. Distinct from the traditional single-stage inventory model, we investigate a two-stage replenishment policy model for deteriorating item considering the effect of imperfect production process, product design, stock level and business-return. A mathematical model utilizing the time weighted inventory (TWI) approach and two-variables fixed point optimization technique is developed to derive the optimal inspection starting time, the number of deliveries, the optimal delivery-time interval and the optimal business-return period. A numerical example is presented to illustrate the model developed. The result shows that the fixed demand rate, the unit holding cost and the unit inspection cost are the critical factors affecting the scheduling and performance of the two-stage supply chain.
机译:本研究将供应商的保修退货和买方的退税政策视为供应商-买方供应链中的业务退货政策。该策略以及显示的库存水平会影响买方的行为。与传统的单阶段库存模型不同,我们研究了一个两阶段的补货策略模型,该模型考虑了不完善的生产过程,产品设计,库存水平和业务回报的影响来使物品变质。建立了利用时间加权库存(TWI)方法和二变量定点优化技术的数学模型,以得出最佳的检查开始时间,交货数量,最佳交货时间间隔和最佳业务回收期。给出了一个数值示例来说明开发的模型。结果表明,固定需求率,单位持有成本和单位检验成本是影响两阶段供应链调度和绩效的关键因素。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号